Industrial Equipment Yard- Bortunco
After years of constant maintenance, dust and mud, Bortunco needed a solution to the high cost of maintaining the parking lot and equipment. As a DIY project, they leveled out their existing potholes and ruts one last time, laid the TRUEGRID and filled with clean limestone. They now have a maintenance-free, attractive, better draining, long term facility lot. This lot handles high-traffic, heavy loads and was a huge success!
Accessories:Yellow SuperSpots
Zip Code:
77050
Sub Base Material:
Existing Compacted Aggregate
Fill Material:
3/4" Clean Limestone