Project

Industrial Equipment Yard- Bortunco

After years of constant maintenance, dust and mud, Bortunco needed a solution to the high cost of maintaining the parking lot and equipment. As a DIY project, they leveled out their existing potholes and ruts one last time, laid the TRUEGRID and filled with clean limestone. They now have a maintenance-free, attractive, better draining, long term facility lot. This lot handles high-traffic, heavy loads and was a huge success!

Accessories:Yellow SuperSpots

Yellow SuperSpots

Read the Case Study

Zip Code: 77050
Sub Base Material: Existing Compacted Aggregate
Fill Material: 3/4" Clean Limestone